CDPH Lead Inspector/Assessor California State Exam 2025 - Complete Practice Resource

Question: 1 / 560

Which of the following is considered temporary containment of lead-based paint?

Complete removal of the paint

Application of specialized cleaning techniques

Covering lead paint with non-lead paint

The choice of covering lead paint with non-lead paint is considered temporary containment of lead-based paint because it creates a barrier between the lead-containing substrate and the environment. This method effectively reduces the risk of lead exposure by sealing the lead paint underneath a non-toxic layer, minimizing the potential for lead dust and chips to become airborne or accessible, which can be a significant hazard, especially in homes inhabited by children or pregnant women.

This approach is not a permanent solution, as it does not eliminate the lead paint itself; rather, it merely encapsulates it. To maintain safety, periodic inspections and potential reapplications of the non-lead paint might be necessary to ensure the integrity of the containment continues to protect against lead exposure.

In contrast, complete removal of the paint is a more permanent solution rather than temporary containment. Specialized cleaning techniques may reduce lead dust but do not provide a physical barrier, so they do not qualify as containment. Installation of lead barriers typically involves more extensive measures and regulations, indicating a more permanent remediation approach rather than a temporary containment solution.

Get further explanation with Examzify DeepDiveBeta

Installation of lead barriers

Next Question

Report this question

Subscribe

Get the latest from Examzify

You can unsubscribe at any time. Read our privacy policy